POWER STATIONS

Engineering , Design , Implementation , Installation and Application of the complete all Civil works .

Gerza  Power station (2020) GIZA         AL-AYAT  ( 220 66 11 KV – GIS sst )

OWNERB : E.E.T.C                                                                       

SCOPE OF WORK
* Engineering , desgin , implementation , installation and application of the complete all civil works.
* Complete all Electro – Mechanical works which include but not limited ( Firefighting works – Fire Hydrant works -Fire alarm &fire detecting system including  ( FACP )-Lightening works – Ventilation 
Air condition system – Outdoor & indoor lighting crane supply and installation Work-Low voltage panels – Gantries & Steel structure – Earthing System )

HOSH ESSA – ELBEHERA ( 2020 )         (220 66 11 KV – GIS sst)                

OWNER : E.E.T.C                                                                                                                  
                               SCOPE OF WORK                                      * Engineering , design , implementation , in stallation  and  application of the complete all civil works.                   
*  Electro – Mechanical Works .
                                                                   

TEMAI EL-AMDID ( 2018 )
ELMANSOURA .
( 220 66 11 KV – sst )

OWNER : E.E.T.C                                                     
 
PROJECT COMPONENTS  
*  Installation and Application of the complete Civil works .
*  Electro – Mechanical works( Fire Hydrant Works ).
 

BENBAN4 – ASWAN ( 2018 ) 
(2206611 KV – GIS sst)

OWNER : XD EGMAC                                                                                  PROJECT COMPONENTS                          
* Installation and Application of the complete Civil works.
*  Electro – Mechanical works ( Fire Hydrant works ).

WATANYA (2020) CAIRO , 5 th Settement (220 66 11 KV – GIS sst )

OWNER : E.E.T.C                                                                            
SCOPE OF WORK  
  * Engineering , design , implementation , installation and application of the complete all civil works.
* Electro – Mechanical works ( fire hydrant works ) 
        

KARM EL DEEB  ( 2016 2017 ) ASWAN (220 66 11 KV – GIS sst ) 

OWNER : E.E.T.C                                                                        
                                                                                                  SCOPE OF WORk                              
  Engineering , design , implementation , installation and  application of the complete all civil works.                      
*  Electro – Mechanical  works ( fire hydrant  works )   
                         

TAMYA (2019) AL FAYOUM           (220 66 11 KV – GIS sst )  

OWNER : E.E.T.C                                                                                  
SCOPE OF WORK
* Installation and application of the complete all civil works.
* Electro – Mechanical works ( fire hydrant works ) 
                        

SHARM EL-SHEIKH ( 2019)  (220 66 11 KV – GIS sst ) 

OWNER :    E.E.T.C                                                                         
 SCOPE OF WORK                                  
  * Installation and application of the complete all civil    works.                                                
* Electro – Mechanical works ( fire hydrant works )
 
                             

ESNA ( 2018) LUXOR
( 220 66 11 KV sst ) 

OWNER : E.E.T.C                                                                             
                             PROJECT COMPONENTS                               
* Installation and application of the complete all civil works.  * Electro – Mechanical works ( fire hydrant works )                                

NEW KARAM EL- DEEB ( 2019 )     
Aswan ( 220 / 66 / 11 KV – s/st )          

OWNER :  E.E.T.C                                                                                                                                                                      PROJECT COMPONENTS                                                      * Engineering , design ,  implementation , installation and  application of the complete all civil works .                 
 * Electro – Mechanical works ( Fire Hydrant Works )   
                         

GAMASA  2018  (220 66 11 KV sst)

     OWNER :  E.E.T.C                                                                                 
PROJECT COMPONENTS                     
   * Installation and application of the complete all civil works                 
* Electro – Mechanical works ( fire hydrant works ).
                              

EAST ASYUT ( 2018 ) 
(220 66 11 KV sst ) 

OWNER :  E.E.T.C                                                                             
PROJECT COMPONENTS                    
* Installation and application of the complete all civil works.
* Electro – Mechanical works ( fire hydrant works ) 
     

BENBAN 1 ( 2016 2017 ) ASWAN (220 66 11 KV sst)
 

OWNER :  E.E.T.C                                                                                                                       
PROJECT COMPONENTS                    
* Installation and application of the complete all civil works.    
* Electro – Mechanical works ( fire hydrant works ). 
                     

SOUTH QENA ( 2016 2017) QENA
(220 66 11 KV sst )              

  

OWNER :  E.E.T.C                                                                            
PROJECT COMPONENTS                     
* Installation and application of the complete all civil works.
* Electro – Mechanical works ( fire hydrant works ).  

ASYOT  1 (2015 2016 )
(220 66 11 KV sst)
 

OWNER :  E.E.T.C                                                                                            
                          PROJECT COMPONENTS                                                              
* Installation and application of the complete all civil works
* Electro – Mechanical works ( fire hydrant works ).                   

NEW ESNA ( 2015 2016 ) LUXOR
( 220 66 11 KV sst )
             

 

OWNER : E.E.T.C                                                                                  
PROJECT COMPONENTS                     
* Installation and application of the complete all civil works.
* Electro – Mechanical works ( fire hydrant works )
.    

SOUTH TANTA TRANSFROMERS     
( 2013 ) GHARBYA ( 220 66 11 KV sst )                        ( civil works  )                       

OWNER :  E.E.T.C                                                                                     
PROJECT COMPONENTS                            
 civil work for the  transformers station , control building , administrative building , roads , cable ducts and fences built on around 1500 m2 .                     

 

Haram Sub Station Giza

 Project components                               
Haram sub station Giza Voltage 220 / 66 / 11 KV 4 × 125 M V A s/st Owner:A B B For high voltage S.A.E.  , Civil work for a yard 220 of the transformers stations built on around12000,square meters, roads and cable ducts Project date:2007 Project value (in million pounds):5.200

Zagazig Sub Station 

                      Project components                                
Zagazig sub station Zagazig Voltage 220 / 66 / 11 KV s/st Owner:The Egyptian German Electrical Manufacturing Co. (EGEMAC)  , Civil work for the transformers station built on around 3000square meters and of 12m high in addition to an administrative building, fences and cable ducts Project date:2006/2004 Project value (in million pounds): 12.500        

Abo El-Matameer Sub Station

Project components                         
Abo El-matameer sub station Beheira Voltage 220 / 66 / 11 KV 4 × 125 M V A + 4 × 40 M V A s/st Owner:A B B For high voltage S.A.E.  , Civil work for the transformers station built on around 22000square meters. Consists of a 66 K.V building, control building, yard 220, roads, fences and cable ducts Project date:2007 /2006 Project value (in million pounds):10.800 .                

Torra Sub Station       

                        Project components                                 
Torra sub station Cairo Voltage 220 / 66 / 11 KV GIS s/st   Owner:The Egyptian German Electrical Manufacturing     Co. (EGEMAC) , Civil work for the transformers station,    control building, roads, cable ducts,and fences built on     around 8500 square meters Project date:2011 -2012     Project value (in million pounds):18.000 .              

6th of October Sub Station

Project components                        
6th of October sub station Cairo Voltage 66 / 11 KV s/st. Owner:The Egyptian German Electrical Manufacturing Co. (EGEMAC) , Civil work for the transformers station, control building, roads, cable ducts,and fences built on around10000 square meters Project date:2011 -2012 Project value (in million pounds):15.000 .

Abnoob Sub Station Assuit

                       Project components                                     
Abnoob sub station Assuit Voltage 66 / 11 KV s/st Owner Project value (in million pounds) The Egyptian German   Electrical Manufacturing Co. (EGEMAC) Civil work for the transformers station, control building, roads, fences and cable ducts built on around 4500square meters in     addition to a building 66 2009 7.900 .                  

Housing Projects

AL-SAFWA TOWER               ( 2013 )           

A residential building consisting of a basement , ground floor and 11 floors .
The building is fully finished in high quality . 

SECON Nile Towers

SECON Nile Towers  Project value (in million pounds):5.00 Egyptian Saudian Company Project components Through the charming city of Cairo, at Cornish El-Nile, 10000 square meters represents «Falcon Tower» project, a project that is characterized by the sophisticated location, the distinguished designs, wonderful view over the vastest Nile spots, on El-Dahab island with a view of one of the world›s wonders, the Giza Pyramids. The project is located immediately on Cornish El-Nile beside     «El-Salam International Hospital» and it is composed of two towers and each tower is 23 floors Project date 2014 (under construction).

NAKHIL VILLA
( 2009 )

5th Settlement
– A villa consisting of abasement , ground floor , 2 floors and roof rooms on an area of 600 m2
.

AL-RAYAT   VILLAS 
  ( 2011 )  

Sheikh Zayed , 2011 ,underconstructions 18 Luxurios Villas consisting of a basement , ground floor , first floor attic , swimming pool built on an area of 300 square meters and the compound extends for 16 Acres . The duration of the project is 4 years .

AL-RAYAT RESIDENCE   ( BUILDINGS ) 
(6TH OF OCTOBER) 2009
 

project component 
32 building consisting of a ground floor and 5 floors. each building extends for an area of 300 – 400 square meters . The project is divided into 4 phases, each extends for 12 months. 22.000 per phase in total 22 * 4
 

EL DOSOKI VILLA 20152016

Project component
area of  land 1000 m2 the  building its 500 m2 consisting of 4 floor , and Roof the  total area of   building 2200 m2 .

ADEL EL GAZAR VILLA – 20152016 

Project components 
Area of  land 1100  m2 the  building itis 500 m2  consisting of  5 floor  and roof  the total area of building 2900 m2
  

ISMAILIA  9 OWNERS ASSOCIATION ( OBOUR ) – 2012

Project components 
A residential building consisting of  basement , ground floor and 11 floors over an area of  456 m2 . the building is fully finished in high quality. 

AL- ISMAILIA 8 OWNERS ASSOCIATION  ( OBOUR) 2011 

Project components 
A residential building consisting of basement , ground floor and 11 floors over an area of 1018 m2 . the building is fully finished in high quality. 

METWALLY EL-SHARAWY TOWER   Nasr city – 2011 

Project components 
A residential building  at Nasr city   consisting of a basement , ground floor and 11 floors over an area of  625 square meters .  other building extend for 425 square meters . the building  is fully finished in high quality.  

AL-KHOLAFAA AL-RASHEDEEN OWNERS ASSOCIATION ( Heliopolis ) 2011

Project components 
A residential building consisting of basement , ground floor and 11 floors over an area of 1018 m2 . the building is fully finished in high quality.

ISMAILIA 7 OWNERS ASSOICATION (Obour ) 2011


Project components
A residential building consisting of basement , ground floor and 10 floors over an area of 456  m2 . the building is fully finished in high quality. 
 

ISMAILIA 6 OWNERS ASSOICATION (Obour) 2009

Project components
A residential building consisting of basement , ground floor and 10 floors over an area of 460 m2 . the building is fully finished in high quality. 

ISMAILIA 5 OWNERS ASSOICATION (Obour) 2009

Project components
A residential building consisting of basement , ground floor and 10 floors over an area of 460 m2 . the building is fully finished in high quality. 

ISMAILIA 4 OWNERS ASSOICATION (Obour ) 2009


Project components
A residential building consisting of basement , ground floor and 11 floors over an area of  460  m2 . the building is fully finished in high quality.   

ISMAILIA 3 OWNERS ASSOICATION (Obour ) 2008


Project components
A residential building consisting of basement , ground floor and 11 floors over an area of 460 m2 . the building is fully finished in high quality.   

EMAN TOWER OWNERS ASSOICATION (Mariooteya) 2008


Project components
A residential building consisting of basement , ground floor and 11 floors over an area of 480 m2 . the building is fully finished in high quality.   

ISMAILIA 2 OWNERS ASSOICATION (Obour) 2009

Project components
A residential building consisting of basement , ground floor and 8  floors over an area of 512 m2 . the building is fully finished in high quality. 

BRIGADIER ADEL EL-GAZZAR VILLA  5th settelment – 2008

Project components 
A  villa  consisting of a basement , ground , frist and second floors and roof  rooms on an area of 900  square meters .

ISMAILIA 1 OWNER ASSOICATION (OBOUR ) 2008

Project components
A residential building consisting of basement , ground floor and 11 floors over an area of 460 m2 . the building is fully finished in high quality. 

KAWTHER TOWER OWNERS ASSOCIATION   ( Al sabaa ) 2008 

Project components
A residential building consisting of basement , ground floor and 5 floors over an area of 510 m2 . the building is fully finished in high quality. 

GAWHARET  AL-MANHAL OWNER ASSOICATION (9th area in nasr city) 20032004

Project components
A residential building consisting of basement , ground floor and 11 floors over an area of 658 m2 . Some buildings extend for 455 m2 . the building is fully finished in high quality. 

YOSR TOWER OWNER ASSOICATION (Mariooteya ) 20032004

Project components
A residential building consisting of basement , ground floor and 11 floors over an area of 310 m2 . the building is fully finished in high quality. 

AL-AMAL OWNERS ASSOCIATION  ( GOLF ) 19971999

Project components 
A residential building at Golf  consisting of a basement , ground floor ( villa with a swimming pool  over an area of 575 m2 ) and 11 floors. Other building extend for 370 m2. the building is fully finished in high quality. 

GARDEN CITY VILLAS PROJECT 6th October 19962000

Project components 
10 luxurrously_ finished villas with swimming pool . each villa extend for  1200 m2  and consisting of a basement and a ground floor . the area of each floor is about 250 square meters . 

GEZIERT EL- ARAB OWNERS ASSOICATION (Mohandessen) 19941995 

Project components 
A residental – administrative building consisting of a basement , ground floor, 7 typical  floors in addition to 6 extra floors  over  an area of 900  m2 . other building s extend for  700 m2, the building  is fully finished in high quality . 

DAR EL-SAFA OWNERS ASSOICATION (GOLF) 

19921994

OMER AFANDI OWNERS  ASSOICATION (Nasr city) 19911992

A residential – commercial  building consisting of a basement , ground floor , typical floors and extras over an area of 600 m2. some building extend for 400 m2.  the building is fully finished in high quality.  

DAR AL-HANA OWNERS ASSOICATION (GOLF) 19901991

project  components
A residentail – administrative – commercial  building  at Golf  consisting of a basement , ground floor and 10 typical floors in addtion to a 2 – floor  villa over an area of 700 m2. some building extend for 560 m2 . the building is fully finished in high quality.  

AL- SAEED OWNERS ASSOICATION (Mohandseen ) 19911992

Project components 
A residential – commercial building  at  Samy saeed square in mohandseen consisting of a basement , ground floor , 9 typical  floors and a 2 – floor villa on top. some building s extend  for 700 m2 . the building is fully finished in high quality. 

AMER OWNERS ASSOCIATION (DOKKI) 19901991

Project components
A residential – administrative – commercial building consisting of a basement , ground floor and 7 typical floors in addtion to 6 extea floors over an area of 900 m2 . some building extend for 700 m2 . the building is fully finished in high quality.

DAR AL-SALAM OWNER ASSOICATION (GOLF ) 1988

Project components 
A residential – administrative – commercial building at Golf  consisting of a basement , ground floor , 9 typical floors of an area of 790 m2 . the building is fully finished in high quality. 

A BUILDING AL NAKHIL SUMMER RESORT (Agami) 1988

Project components 
A fully – integrated building consisting of 5 floors on an area of 250 m2 for each floor. 

QANATER MOSOQUE – 2021

Project components 
* Ground floor : men payer room – women prayer room – toilets – water treatment .
* 1st  floor : mosque  nave –  acoustics room .
* Roof  : classes .
* Minaret .


AL – GHAFOOR MOSQUE (Abanoob village) 2009

Project components 
A mosque on an area  of  250 m2. 

AL – RAHMAN MOSOQUE  2007 

Project components 
A mosque on an area of 1000 m2 with a coner for ladies  and Azhari nursery . 

AL – GOFRAN MOSQUE – 2008 

Project components
A mosque on an area of 600 m2 with a coner for ladies , 2 administrative floor and free clinics. 

Al-Amal Owners Association (Golf)

Project components
Al-Amal Owners Association (Golf) 
:A residential building at Golf consisting of a basement, ground floor (villa with a swimming pool over an area of 575 square meters) and 11 floors. Other buildings extend for 370 square meters. The building is fully finished in high quality. Project date:97/99 Project value (in million pounds):4.75

INTERIOR DESIGN PROJECTS

ELQANATER MOSQUE ElQANATER ELKHAYREYA -2021


PROJECT COMPONENTS
Ground floor: Men prayer room -Women prayer room – toilets- Water treatment 
1st floor: Mosque nave- Acoustics room 
Roof: Classes 
Minaret
 

EL_DABAA MOSQUE  ELDABAA Highway-2021


project components
Ground floor:Men prayer room- Toilets 
Minaret 


DUBLEX 5th SETTLEMENT -2021 


Project components
Basement: Living area-dining area-American kitchen-bedroom-interior swimming pool- Bathroom-outdoor garden
Ground floor: Living area- 3 bedrooms – 2 bathrooms-kitchenet

 

EBNSINA PHARMACY Qatar 


2021

Eng. Bassel Villa 


Eng. Bassel Villa Project components Project date Project value Acts of amendments and additions in the villa Duration of the contract 45 days 1 million Ryals All concrete works and buildings are done

ADMINISTRATIVE & INDUSTRIAL PROJECTS 

EPNATY OR PHANAGE 6H OF OCTOBER – 95 99

OWNER
Ebnaty NGO for young girls care 
Project components 
2building for orphans housing, nursery, embroidery workshop, mini-factory, mosque and a building for eradication of illiteracy .

FACTORY FOR EGGPCO 10th of Ramadan – 97 98 

OWNER 
The Egyptian German Gears Production co. (EGGPCO)
Project components 
A factory for gears production an area  of 2500 m2 And of 11m high. Warehouses extend on an area of 1800  m2 and of 8m high in addition to an administrative building of 1200m2 , internal roads and fences
 

ELECTRICAL PANELS FACTORY AND ADMINISTRATIVE BUILDING FOR EGEMAC CO. Matareya- 9497 

Owner 
The Egyption German Electrical Manufacturing co. ( EGEMAC)
Project components
2 factories for 220 kv and 664 kv electrical panels assembly on an area of 1755 square meters and of 16 and 10 square meter high. warehouses are  6m high and extend on an area of 2300 squre meters in addition to an administrative building. Over the warehouses are 2 floors built on around 1750 square meters for each floor. the total surface area of the factory and warehouses is around 6400 square meters. in addition , there are car lanes, internal corridors and fences. The administrative building facade is made of faire face concrete.

OBOUR FACTORY FOR FOOD INDUSTRIES cairo – 2001 2002

Owner 
obour factory for food industries
saad mohamemd el-sanad
project components 
the building consists of a 3-floor high factory of a surface area of 2000 m2 with an attached 3-floor high administrative building that extends on an area of 500 m2.

X-RAY FILM FACTORY 10th of ramadan – 9091

Owner 
Arab company for Drug industries & medical appliances( ACDIMA)
Project Component
An administrative building  and warehouses specially designed to prevent any leakage of dust inside. the factory is air-conditioned and the main building area is around 2500 square meters and 60m high.  there is a 2-floor  administrative building  , transformers room, medium pressure panels, fences and concrete roads (the total surface area of the project is around 1500 square meters )

DREAM LAND HOSPITAL PROJECT  2004 2006
Dream land 6th Of October
 

Owner
Dream land
City Gas Co. 
Project Components
integrated works for the hospital building and fences on an area of 3000 square meters 

FACTORY FOR GAS FILLING EPICO GAS CO. 93 

Owner
EPICO GAS CO. 
Project components 
civil work and administrative building (fences , roads , concrete and steel works 